Your login status/name: Not Logged in

mainroads logo

 

logo

   

Dallas Millward

Last visit date: 10 February 2024
Auditor Information
Auditor Status
Audit Team Trainee, Roadworks Traffic Manager (RTM)
Username (usernames must only include lowercase characters and not include any spaces)
**********
Organisation
Not in List
Public Email
This email address is being protected from spambots. You need JavaScript enabled to view it.
Public Phone
0436 915 730
Auditor number
918 (T) (R)
Auditor Location
South West
LG Area
Shire of Capel
Days Left for CPD Update Course
873
Days Left for RTM Expiry:
87
Days Left for AWTM Expiry:
943
Days Left for Insurance Expiry:
93
Team Leader in Audits:
0
Team Member in Audits:
8
e
{"logintype":"USERNAME","namestyle":"FIRSTNAME_LASTNAME","formatname":"NAME","avatar":"0","status":"0","confirmusermail":"0","passwordstrengthmeter":"0","forcerequired":"0","firstLoginUrl":"","loginUrl":"","profileACL":"2","profileACLcustom":"5","hideempty":"1","tabs":"1","layout":"1","layout_width":"center","layout_maxwidth":"500","layout_form":"vertical","bootstrap":"0","bootstrap_icons":"0","socialconnect_type":"popup","socialconnect_profilelink":"0","socialconnect_profilelink_btnicon":"0","socialconnect_loginlink":"0","socialconnect_loginlink_btnicon":"0","facebook_enabled":"0","facebook_application_id":"","facebook_application_secret":"","twitter_enabled":"0","twitter_consumer_key":"","twitter_consumer_secret":"","google_enabled":"0","google_client_id":"","google_client_secret":"","google_api_key":"","linkedin_enabled":"0","linkedin_api_key":"","linkedin_secret_key":""}

UPLOAD EVIDENCE OF ROAD SAFETY RELATED TRAINING

ROAD SAFETY RELATED TRAINING ATTENDED

Training NameTraining ProviderDurationDate CompletedVerified by RSA Panel
CPD Update CourseIPWEAOther18/08/2023
Results 1 - 1 of 1

List submissions - Team Leader in Audits (only applicable for Senior Road Safety Auditors)

Date of AuditLocation TypeStage of AuditProject TypeDetails

Team Leader In Audits Experience Summary

Current 5 Years
Project TypeFeasibilityPreliminary DesignDetailed DesignPre/Post openingRoad Safety Inspection
Blackspot project-----
Cycling Facilities-----
Grade Separation-----
Intersection Improvements Major-----
Intersection Improvements Minor-----
Land Use Development-----
Local Traffic Management Project-----
New Road Project-----
New roundabout-----
Pedestrian Facilities-----
Public Transport Project Major-----
Public Transport Project Minor-----
Road Safety Inspection – Intersection-----
Road Safety Inspection – Route-----
Rural Road Upgrade-----
Rural Route Treatment-----
Safety Barrier Project-----
Shared use Facilities-----
Signalised Intersection-----
Streetscape Works-----
Traffic Calming-----
Unsignalised Intersection-----
Urban Road Upgrade-----
Urban Route Treatment-----
Totals00000
Current 10 Years
Project TypeFeasibilityPreliminary DesignDetailed DesignPre/Post openingRoad Safety Inspection
Blackspot project-----
Cycling Facilities-----
Grade Separation-----
Intersection Improvements Major-----
Intersection Improvements Minor-----
Land Use Development-----
Local Traffic Management Project-----
New Road Project-----
New roundabout-----
Pedestrian Facilities-----
Public Transport Project Major-----
Public Transport Project Minor-----
Road Safety Inspection – Intersection-----
Road Safety Inspection – Route-----
Rural Road Upgrade-----
Rural Route Treatment-----
Safety Barrier Project-----
Shared use Facilities-----
Signalised Intersection-----
Streetscape Works-----
Traffic Calming-----
Unsignalised Intersection-----
Urban Road Upgrade-----
Urban Route Treatment-----
Totals00000

List submissions - Team Members in Audits if available

Team Member In Audits Experience Summary

Current 5 Years
Project TypeFeasibilityPreliminary DesignDetailed DesignPre/Post openingRoad Safety Inspection
Blackspot project-----
Cycling Facilities-----
Grade Separation-----
Intersection Improvements Major---1-
Intersection Improvements Minor---1-
Land Use Development-----
Local Traffic Management Project----1
New Road Project-----
New roundabout--1--
Pedestrian Facilities-----
Public Transport Project Major-----
Public Transport Project Minor-----
Road Safety Inspection – Intersection----1
Road Safety Inspection – Route-----
Rural Road Upgrade-----
Rural Route Treatment-----
Safety Barrier Project-----
Shared use Facilities1----
Signalised Intersection-----
Streetscape Works---1-
Traffic Calming-----
Unsignalised Intersection-----
Urban Road Upgrade-----
Urban Route Treatment-1---
Totals11132
Current 10 Years
Project TypeFeasibilityPreliminary DesignDetailed DesignPre/Post openingRoad Safety Inspection
Blackspot project-----
Cycling Facilities-----
Grade Separation-----
Intersection Improvements Major---1-
Intersection Improvements Minor---1-
Land Use Development-----
Local Traffic Management Project----1
New Road Project-----
New roundabout--1--
Pedestrian Facilities-----
Public Transport Project Major-----
Public Transport Project Minor-----
Road Safety Inspection – Intersection----1
Road Safety Inspection – Route-----
Rural Road Upgrade-----
Rural Route Treatment-----
Safety Barrier Project-----
Shared use Facilities1----
Signalised Intersection-----
Streetscape Works---1-
Traffic Calming-----
Unsignalised Intersection-----
Urban Road Upgrade-----
Urban Route Treatment-1---
Totals11132