Your login status/name: Not Logged in

mainroads logo

 

logo

   

Kevin Chung

Last visit date: 16 October 2023
Auditor Information
Auditor Status
Username (usernames must only include lowercase characters and not include any spaces)
**********
Organisation
City of Armadale
Public Email
This email address is being protected from spambots. You need JavaScript enabled to view it.
Auditor number
769
Auditor Location
Metropolitan
LG Area
City of Armadale
Days Left for CPD Update Course
-739392
Team Leader in Audits:
0
Team Member in Audits:
0
e
{"logintype":"USERNAME","namestyle":"FIRSTNAME_LASTNAME","formatname":"NAME","avatar":"0","status":"0","confirmusermail":"0","passwordstrengthmeter":"0","forcerequired":"0","firstLoginUrl":"","loginUrl":"","profileACL":"2","profileACLcustom":"5","hideempty":"1","tabs":"1","layout":"1","layout_width":"center","layout_maxwidth":"500","layout_form":"vertical","bootstrap":"0","bootstrap_icons":"0","socialconnect_type":"popup","socialconnect_profilelink":"0","socialconnect_profilelink_btnicon":"0","socialconnect_loginlink":"0","socialconnect_loginlink_btnicon":"0","facebook_enabled":"0","facebook_application_id":"","facebook_application_secret":"","twitter_enabled":"0","twitter_consumer_key":"","twitter_consumer_secret":"","google_enabled":"0","google_client_id":"","google_client_secret":"","google_api_key":"","linkedin_enabled":"0","linkedin_api_key":"","linkedin_secret_key":""}

UPLOAD EVIDENCE OF ROAD SAFETY RELATED TRAINING

ROAD SAFETY RELATED TRAINING ATTENDED

Training NameTraining ProviderDurationDate CompletedVerified by RSA Panel
Road safety engineeringMRWA/IPWEA2 days23/10/2020
Road Safety AuditIPWEA/MRWA3 days13/11/2018
Results 1 - 2 of 2

List submissions - Team Leader in Audits (only applicable for Senior Road Safety Auditors)

Date of AuditLocation TypeStage of AuditProject TypeDetails

Team Leader In Audits Experience Summary

Current 5 Years
Project TypeFeasibilityPreliminary DesignDetailed DesignPre/Post openingRoad Safety Inspection
Blackspot project-----
Cycling Facilities-----
Grade Separation-----
Intersection Improvements Major-----
Intersection Improvements Minor-----
Land Use Development-----
Local Traffic Management Project-----
New Road Project-----
New roundabout-----
Pedestrian Facilities-----
Public Transport Project Major-----
Public Transport Project Minor-----
Road Safety Inspection – Intersection-----
Road Safety Inspection – Route-----
Rural Road Upgrade-----
Rural Route Treatment-----
Safety Barrier Project-----
Shared use Facilities-----
Signalised Intersection-----
Streetscape Works-----
Traffic Calming-----
Unsignalised Intersection-----
Urban Road Upgrade-----
Urban Route Treatment-----
Totals00000
Current 10 Years
Project TypeFeasibilityPreliminary DesignDetailed DesignPre/Post openingRoad Safety Inspection
Blackspot project-----
Cycling Facilities-----
Grade Separation-----
Intersection Improvements Major-----
Intersection Improvements Minor-----
Land Use Development-----
Local Traffic Management Project-----
New Road Project-----
New roundabout-----
Pedestrian Facilities-----
Public Transport Project Major-----
Public Transport Project Minor-----
Road Safety Inspection – Intersection-----
Road Safety Inspection – Route-----
Rural Road Upgrade-----
Rural Route Treatment-----
Safety Barrier Project-----
Shared use Facilities-----
Signalised Intersection-----
Streetscape Works-----
Traffic Calming-----
Unsignalised Intersection-----
Urban Road Upgrade-----
Urban Route Treatment-----
Totals00000

List submissions - Team Members in Audits if available

Team Member In Audits Experience Summary

Current 5 Years
Project TypeFeasibilityPreliminary DesignDetailed DesignPre/Post openingRoad Safety Inspection
Blackspot project-----
Cycling Facilities-----
Grade Separation-----
Intersection Improvements Major-----
Intersection Improvements Minor-----
Land Use Development-----
Local Traffic Management Project-----
New Road Project-----
New roundabout-----
Pedestrian Facilities-----
Public Transport Project Major-----
Public Transport Project Minor-----
Road Safety Inspection – Intersection-----
Road Safety Inspection – Route-----
Rural Road Upgrade-----
Rural Route Treatment-----
Safety Barrier Project-----
Shared use Facilities-----
Signalised Intersection-----
Streetscape Works-----
Traffic Calming-----
Unsignalised Intersection-----
Urban Road Upgrade-----
Urban Route Treatment-----
Totals00000
Current 10 Years
Project TypeFeasibilityPreliminary DesignDetailed DesignPre/Post openingRoad Safety Inspection
Blackspot project-----
Cycling Facilities-----
Grade Separation-----
Intersection Improvements Major-----
Intersection Improvements Minor-----
Land Use Development-----
Local Traffic Management Project-----
New Road Project-----
New roundabout-----
Pedestrian Facilities-----
Public Transport Project Major-----
Public Transport Project Minor-----
Road Safety Inspection – Intersection-----
Road Safety Inspection – Route-----
Rural Road Upgrade-----
Rural Route Treatment-----
Safety Barrier Project-----
Shared use Facilities-----
Signalised Intersection-----
Streetscape Works-----
Traffic Calming-----
Unsignalised Intersection-----
Urban Road Upgrade-----
Urban Route Treatment-----
Totals00000

Search